AN HO SCALE STORY ABOUT LACROSSE
So, three attempts to add an HO Scale action sports scene to a layout. I realized that I was coming up short after the first two. But let me explain. My first venture into replicating a sports scene was with my youngest grandson. He is into baseball; no shortage of HO Scale baseball figures and accessories on the market. The HO Scale baseball scenario was added to his layout. Then some time passes and the second scene that I worked on was soccer/football. My oldest grandson was into soccer. Again, no sparseness of available HO Scale soccer figures on the market. The HO Scale soccer match found a place on my nearly complete layout.
Leave it up to my third grandson to become involved in a sport, that yes, I wanted to add to my layout but for which no HO Scale figures existed. His sport of choice is Lacrosse. Absolutely no HO Scale figures available that I could find. Flashback a couple of years to when I reached out to CatzPaw Innovations, LLC for HO Scale 3D printed figures of the three generations of my family. CatzPaw took the family photos and some height/weight figures that I sent to them and worked their magic and produced recognizable 3D plastic figures that have been positioned on the dock at the harbor area on my layout for the past several years.
Now, once again, in need of something unavailable on the web, I reached out to the people at CatzPaw expecting a polite rejection to my requirement. However, instead, surprise, surprise, CatzPaw accepted the challenge and working with me over a period of time, together we came up with Lacrosse player pictures, referee outfits and the color scheme of uniforms on two different teams. This was no easy task because each team has 10 players. After I received the finished product from CatzPaw, my grandson assisted with positioning the players on the field of my layout. His second comment was on the realism of all the figures; he was totally blown away. But his first comment was, “what, there are no lines on the field.” I told him to use his imagination and move past this shortcoming and together we put together a Lacrosse match. I tried to capture the action with the following pictures.








BUILDING THE CONOWINGO MODELS PAXBUG HO SCALE DOODLEBUG
A few weeks ago, I decided to tackle putting together Conowingo Models HO Scale Paxbug for my layout. I had just added a main street with a track running down the center of the street. What better than adding a unique looking trolley to this new section on my layout? This section of town represents downtown Middletown NY, which does exist, the street is North Street in Middletown, which also exists, and the trolly line represents Wallkill Transit, which did exist in the early 1900s and ran between Goshen NY and Middletown, a distance of about 15 miles.
The following is just some preliminary information provided by Conowingo introducing the contents and some requirements associated with this kit.
Conowingo Models Paxbug Doodlebug HO Scale
This is a conversion kit for the Bachmann GE 44-Ton diesel switcher into a passenger carrying doodlebug.
The Bachmann body appears to be easy to convert to DCC.
*** YOU PROVIDE YOUR OWN Bachmann 44-Ton switcher***
This kit includes the following-
LED headlight and passenger compartment LED.
Working Adlake Marker Lights
3D printed parts including a visor with headlight and bell, radiator and exhaust stack.
Tichy parts
Conowingo Railroad decals
Conowingo Models Paxbug HO Scale Doodlebug



The first task in the instructions provided with the kit is to prepare the Bachmann mechanism. The instruction sheet describes removing the shell by removing the two screws on the center side portion of the underside. I did not have the Bachmann model, but I did have an undecorated GE 44-ton diesel from Rapido. Sounded easy peasy. I contacted Chris from Conowingo Models, and he responded that although he hadn’t done this assembly with a Rapido 44-ton, the assembly should be similar. It made sense to me. This proved not quite right. It turns out that the shell on the Rapido is attached with four screws, none of which are in the same two locations as the Bachmann. At this point, it dawned on me that this project was going to be a series of good news, bad news assembly steps. The switch to Rapido, at this point, was some bad news. Anyway, I went ahead with building the Paxbug.
The assembly was relatively straightforward following the printed instructions. I numbered the instruction pages in the correct sequence because I found myself going back and forth a lot during the build. I made a few alterations to the construction. I did not like the way the black construction paper/chip board roof looked and substituted thin 1/32″ scribed wood for all the roofing. In addition, I bypassed the instructions for wiring, heeding the warning in the instructions. As the instructions said, “WE ARE NOT WIRING EXPERTS”, and neither am I. I was hoping that the lighting provided by the Rapido mechanism would suffice. We’ll see. Let me just say, over the years, I have assembled quite a few craftsman kits, Bar Mills, Campbells, Taurus, Muir Models, etc. I would have to say that I found this model to be the most challenging of the bunch but if you are patient during the assembly process, you will be rewarded with the final appearance of the Paxbug body.
Now the moment of truth. Fitting the Paxbug body onto the Rapido mechanism. I still hadn’t considered how I would account for the difference in the mounting screw positions yet. A little more bad news. The Rapido mechanism must be a little wider or its contents blocked slipping the Paxbug shell cleanly onto the Rapido. So now, I had to do a significant amount of carefully trimming and removing some of the 1/16″ strip wood bracing that was added to the Paxbug at the early stages of this project. The trimming had to be done carefully. I didn’t want to remove too much of the bracing, so it was trim, test the fit, trim, test the fit and so on. And now the good news. the body fit snugly onto the Rapido mechanism, and I did not have to figure out how to connect the two parts together. The fit is tight. Now some more good news, the lighting provided by the Rapido base lights the interior and also shows up through the headlight. So, despite a few hurdles, I am completely satisfied with the completed product. I finished it off with some weathering. It looks great on North Street on my layout. The unit runs great, as do all of my Rapido engines. Here are some pictures.





THE BEST OF BOTH WORLDS
Henry has created in his basement an HO Scale train layout and slot car racing track on the same base. Ingenious!! When the grandkids, 3-year-old Rylan and 6-year-old Alex, visit, they are presented with a choice of either operating Henry’s trains, most likely at well above non-prototypical speeds, or racing cars on the adjoining track. I think most of us know how it is with the younger folks of this generation. Model trains are not enough to solely keep the interest of youngsters. However, if the grandparents can provide a setting that offers multiple choices and opportunities for the kids when they visit, maybe, just maybe, down the road, the model train bug will bite the kids.


Adding animation and sound to a train layout may be another alternative. Some time ago, I added an amusement park and zoo to my layout and when the grandkids visit, they wind up listening and watching the carousel go round and round and the horses go up and down and the bear dancing in its enclosure and the aerial tram moving people back and forth. Maybe later on in life they will remember these moments and develop their own interest in model railroading.
A BOY, A HOBBY AND BASEBALL
Maybe as experienced modelers, as most of us are now, we forget how some of us started out when we were young. A basic, easy layout, probably O or O27 Scale with a station and maybe one or two industries and a siding…maybe. It’s been lots of years ago for me so my memories of my first model train layout are a little sketchy. But the following story and pictures, circa 2024, is an example of how we, the “old-timers”, could/should encourage younger people to get started in this amazing hobby. Who knows, maybe a young person can find time for our hobby as well as all the prevalent electronics/apps that are out there today? And so, what follows is the story of a pre-teen age boy who has managed to divide his time among all his interests.
The challenge for an eleven-year-old boy is how to unite his interest in model trains with his Little League baseball and school activities. Fortunately, with support and assistance from family, Mom, Dad and sister Julia, Adam has captured aspects of his favorite sport, baseball, and added this sports theme to his HO scale train layout. Even the family’s pet, a cat named Murray, cooperates by not jumping on or disturbing Adam’s layout. Adam has started his model train hobby with a simple DCC powered oval with a station and a few buildings. However, the highlight of his layout is a to-scale model of one of the Little League baseball fields that Adam plays on. And if you look closely at the photos, you will see Adam playing catcher, his favorite position.








Yep…I think that this is the way a lot of us started out!
YOU MAY ASK WHY? OR REBUILDING A LAYOUT FROM SCRATCH
After sixteen years, I finally decided to trash my point-to-point shelf layout that occupies (should be occupied) three walls of a 12′ X 12′ room. This was no easy decision, but I decided to move forward with a new layout for a number of reasons. All of this was thought about after attending multiple sessions and engaging in numerous conversations at the recent NER Convention in Uniondale NY. Not in any particular order.
- Easier to maintain.
- Continuous running vs. point-to-point.
- Downsizing to a smaller, more compact layout.
- I’m not getting younger- the new layout should be easier to operate and take apart down the road.
- 18″ or greater radius curves for improved operation. No curves less than an 18″ radius
- And did I forget to mention….no more tunnels.




While I’m dismantling the old layout, I’m still trying to save structures, accessories, wiring, scenery and track. This makes for slow going and requires a lot of TLC in the process. Not to say anything about the mess and dust! At this point, I have most of the old layout down and I think that I managed to save most of my harbor area. I’m not sure yet what the new configuration will be…I’ll just have to wait and see. A few shots of the harbor area on the new benchwork.




Day 41 marks the demise of my original Awosting Mountain and Middletown Railroad, the one that existed for sixteen years. At this point, on December 28, 2023, except for the harbor area, the layout has been totally dismantled and removed from the room. Some of the structures and scenery have been saved. Now starts the construction of the benchwork for my new layout. Hopefully I won’t be making the same mistakes that I made previously.
Now, one month later, about one-third of the benchwork has been installed for my planned layout. I think that in model railroading terms, this layout would be considered a small one. The area of my planned layout is still a mess! I need to find locations in the room for my modeling paraphernalia but still provides me with easy access to my layout so that I can work on it when the time comes. A note about the benchwork. My benchwork modules are from Sievers Benchwork (www.sieversbenchwork.com). The instructions, suggestions and recommendations provided by Sievers resulted in an installation, so far, that has been easy to assemble. I chose to use a wood stain, Varathane classic black, for no other reason than appearance. Eventually I will add black curtains around the benchwork to hide the wiring below the layout, so I wanted color compatibility. Just a few photos to show the status of the benchwork on January 21, 2024.




The next steps will be to complete the installation of the benchwork. When the framework is completely installed, I will be able to see how far off my paper design measurements are from the real thing. Should be interesting!
Day 117 March 13, 2024 A few more of the Sievers benchwork sections have been added. I estimate my benchwork installation is about two thirds complete. It’s getting tough to move around the room what with the new benchwork being added and the pieces from my previous layout still in the room. Two photos of the installation progress.


So….it turns out that my initial plan dimensions are turning out different than the actual dimensions as the benchwork is installed, not by much, just several inches. However, these few inches are going to matter in the room where my layout is located. I still need to be able to move freely around the perimeter of the layout. This means that I have to adjust the dimensions of my original track plan. In order to “replan” the original track layout, I purchased a bunch of 30″ X 20″ X 1/8″ brown corrugated paper boards from Michael’s Craft Supply Store. These will be laid out over the frame; the track and any track plan modifications will be drawn on the cardboard sheets and, voila, I should be able to transfer this to the foam sheets that are used for the layout base. If you think that there is a better way, please let me know via the CONTACT US page.
March 31, 2024 I laid the cardboard sheets, one at a time, on top of the partially installed benchwork. Then in accordance with the track plan that I am following, HO Scale code 83 track was put down on top of the paper boards as per the following photos. The track is code 83 from Atlas Model Railroad Co. (atlassrr.com). So far, this is the easy part. I still need to figure out how to connect the three-track harbor area, which is an addition to my original track plan, to the actual layout. Working on that as this is written.



April 22, 2024 After tracing the outline of the track plan on the cardboard sheets that I previously laid out, I stood back and took note. At least on the benchwork that has been installed, the track plan fit. However, one concern that stood out to me is that the track at several points is close to the edge. If I don’t install “something” at these points, I run the risk of engines and rolling stock running off the table and landing on the floor!!! Anyway, I’ll try to resolve that issue at a later date.
Now I started replacing the cardboard sheets with 1/2″ foam sheets from Woodland Scenics (https://woodlandscenics.com) and transferred my track plan from the cardboard onto these sheets. In addition, I needed to return to the challenge of connecting the harbor area that I salvaged from my previous layout with the new track plan. Because my harbor scene is about 101.6 mm (4″) above the base, all the additional track on the layout has to be at least the same height or more above the base. It just would not make sense to have track located below the water level of the harbor! In order to rectify this issue, I’m installing 4″ risers from Woodland Scenics with their Foam Tack product. Right now, judging from the photos below, I’m kind of in the middle of connecting the three tracks from the harbor area to a track on my planned layout. At this point, no roadbed, ballast or track is installed. Simply the 1/2″ foam sheets, portions of foam inclines to adjust heights and 4″ risers. I think that this is working out… we’ll see. Until the next update.






May 2, 2024 A famous Scottish poet once wrote, “the best laid plans of mice and men oft gang awry.” After spending a significant amount of time painstakingly detailing a layout plan on graph paper, drawn to scale using an architect’s scale, measuring multiple times, accounting on the plan for the location of the closet and door in the room, and the actual dimensions of my “dream” layout, and drawing the track positions on cardboard sheets, I recently found a flaw with my planning. While I took into account the open and closed position of the door leading into the train room on my drawings, I failed to consider the space the door needs to swing from an open to a closed position and vice versa. So, at this point I have a few choices; remove the door, never close the door to the room, keep the door closed and enter the room through a window, or figure out how to modify my layout plan, yes, the one that I spent so much time creating.
May 13, 2024 I used Atlas Model Railroad Company Code 83 36″ flex track and a few switches in order to link the three tracks from my previous layout’s harbor area to the track of my new layout. Of course, down the road, I’ll still have to complete roadbed installation, then test run an engine and some cars over the track, correct any problems and then complete ballast installation.


At the same time, some progress is also being made on the rest of the layout.



June 24, 2024 At this point in time, the last sections of the Sievers benchwork were installed. The section that I was concerned about, a 45o triangle with 20-inch sides, was connected to the layout and is pretty close to the room door swinging open and closed. In fact, once again my measurements were off, and I failed to take into account the thickness of the triangle assembly. In fact, I had to shave about 1/4″ (about 7mm) off one side of the triangle in order to solve the door open/close problem. See following photo.

Now the good news, as I mentioned the Sievers frame is complete, the Woodland Scenics 1/2″ foam sheets have all been laid out on the benchwork, and depending upon layout location, I am at various stages of 4″ riser installation, covering with plaster sheets, carefully attaching the roadbed to the risers, laying out the track, first with 2″ foam nails for fit and then replacing these with 1/2″ (about 13mm) track nails for permanent attachment, then ballasting the track, and finally using liquid track cleaner on the installed/ballasted track. And not to make the same mistake as I did on my previous layout, at each step, I tested the electrical connectivity with a voltmeter and track connect integrity by running an engine over the track, something that I did not do on my previous layout, and I paid dearly for that. I don’t know if I mentioned this but my layout is DC and I have about fifteen separate block sections, each one managed by a setting on Atlas Selectors. Again, I think that the keys to this entire project are patience, repeated testing of the track for glitches, cleaning the track and validating the electrical connections.






July 12, 2024

July 16, 2024 The journey that began back in November 2023 has taken eight months to reach this point. Now I know how an artist feels when a blank, untouched canvas is in front of him/her (a bit dramatic but that is how I feel). That’s exactly how I feel looking at the layout in front of me. The Sievers Benchwork is all complete, the Woodland Scenics 1/2″ foam sheets, 4″ risers and roadbed are installed, the Atlas Model Railroad track, turnouts and crossover are in place and all track has been ballasted. I’m using DC power, so I have fourteen individual blocks with power supplied to the mainline and sidings through two MRC TECH 7’s. One controls power to the mainline (five separate blocks) and the other controls power to the sidings (nine blocks). Each block is managed through an Atlas Selector. Throughout the install steps, I constantly re-cleaned track and checked the track for no kinks. I ran several engines over the different sections to verify the integrity of my trackwork and then re-cleaned sections of track again. I do believe that one secret to having a smooth-running operation is clean, dirt-free track and testing. In the near future I do plan to submit an application for the NMRA’s Golden Spike Award. However, for the time being, looking at my blank canvas, I must decide locations…. locations of industries, buildings, stations, towns, etc.
October 1, 2024 So it’s been more than two months since my last layout update. I’ve been working on the NMRA’s Golden Spike Award requirements. The first item on the NMRA checklist addresses Rolling Stock (Motive Power & Cars). Many thanks to Dennis Colucci, a member of our Division, who conducted a few sessions on weathering freight car techniques. I used Dennis’s methodology on several of my freight cars. On a few other cars, I applied a gentler weathering technique.








October 14, 2024 The second item on the NMRA checklist is Model Railroad Setting (Structures & Scenery). So, just a few of the structures, some from craftsman kits and some are detailed commercial kits, that are complete and installed on my layout.











November 17, 2024 Wow!!! It’s been a whole year since I started a rebuild of my layout. It’s moving along. Anyhow, so on my quest for NMRA’s Golden Spike Award, the third requirement is for three different types of trackage, wiring so that two trains can be operated simultaneously, and additional electrical features, such as lighting. The following pictures address these requirements.





The next picture shows the central point of wiring for my DC only layout. A description of the wiring scheme has already been provided.

Next comes the additional electrical features. On my layout, I chose lighting and actionable objects.


My layout, at this point in time, has two types of houses, an outhouse with an electrically operated door that swings open and a lighthouse.






So, these photos represent only a small portion of the material that was submitted in my pursuit of the Golden Spike Award. I haven’t received any feedback related to my submission yet but as soon as I hear I’ll update this post. In the meantime, as I progress on my new layout, I will share the work with everybody.
January 4, 2025 First Happy New Year to all! In the past two months, I have been actively engaged in adding structures, enhancing track ballasting in spots where needed, adding lots of lighting (I think that the lights add a touch of realism to the layout, thanks to Woodland Scenics for their easy to implement lighting system), scenicking and running trains over track just to be sure that everything remains copacetic. The building structures that are on my layout now are a combination of craftsman kits from Downtown Deco, Campbell, Bar Mills, Muir Models Wizards of Wood, kits requiring assembly and detailing mostly from Desin Preservation Models and a couple of Woodland Scenics Landmark Built-&-Ready structures, just because I get lazy sometimes. First a few pictures taken at night.



The next series of pictures are daytime shots of the above buildings.









Next planned project is implementation of a larger town with a trolley running down Main Street and maybe a park also. This will probably take three to four weeks to complete. Keep watching for posts.
March 30, 2025 I’m glad to report that I received the NMRA’s Golden Spike Award at our Division’s January 2025 meeting. Just to reiterate, your layout does not have to be complete so long as you satisfy the requirements associated with the Award. I framed my award and hung it up in my train room.

March 30, 2025 My project took a little longer than expected. But I did complete my vision of the town of Middletown (Orange County, New York), Midway Park (again my version of a real park that existed in the town of Wallkill in the early 1920s) and the Wallkill trolley line running down Main Street in Middletown (Wallkill Transit actually ran between Goshen and Middletown NY with a stop at the real Midway Park in the early 20th century). My point here is that model railroading does not have to be reproductions of real or once real railroads, what we call prototype modelling. There’s plenty of room in the hobby for people with creative imaginations and visions of what they would want their model railroad to look like and that is how their layout evolves.



At this point in time, I would have to say that my layout is maybe a little more than half complete. The next project that I’m envisioning is a residential area with an assortment of craftsman kit homes.
April 30, 2025 Before I become engaged on the project to install a residential area on my layout, I decided to tackle three craftsman kits, two of which are really ancient, for the purpose of installing a coal and oil scenario. For the past month, I’ve tackled the Bar Mills Queen City Coal facility, Alexander Scale Models Oil Tank and Loading Rack, and Muir Models Wizards of Wood NY Ontario & Western Wurtsboro New York coaling facility. Remnants of the Wurtsboro structure are still in place. I renamed Bar Mills’ Queen City Coal, Middletown Coal Co. to bring it closer to home. Assembly was pretty straightforward for all three and directions were easy to follow. I installed a fourth oil related structure, one I had salvaged from my previous layout but of an unknown source, near the other three.




Anybody who may have an idea about who is behind the fourth kit, please let me know, Bob Yustein, via the CONTACT US communication on our website.
January 27, 2026 So, there is a small corner of my layout that looked kind of bare. Didn’t know whether to just throw some trees and scenery on the corner or add something a little more detailed. Went looking through my myriad of unassembled buildings and came up with a Muir Models, Wizards in Wood, Scrap Metal Processing Facility.








To complete the scene, I added some scenic detail, two gondolas on the siding and a lot of scrap metal from Coastman’s Scenic Products, located in Oxford, Oregon. And this is how I took care of the bare corner on my layout.
January 29, 2026 Back to installing the three upscale houses on this side of the tracks. The first is Campbells Grandma’s House, which incidentally I actually built a little incorrectly. Two walls of the house are not in the correct positions. However, this error is not obvious. However, this error is not obvious, I don’t think!






The next is Alexander Scale Models Haunted House which I chose to build as non-haunted since I already had a couple of uninhabited, abandoned houses on my layout.


And lastly, Monroe Models Ellie’s House.

Now, of course, the well-to-do residents on this side of the tracks need a station for their commuting and travel. So, here is the Conowingo Models Eliminator Depot.

Next, we’ll take a look at the other side of the tracks.
February 1, 2026 This is what I call my Bar Mills corner. Three kits, Coopers Way (which is actually six or seven different buildings, Wicked Wandas and Puffer Welding. These are the assembled buildings on the other side of the tracks. Model railroading is lots of different things to lots of people. For me, when I look at a bare spot on my layout, I am an artist in front of a blank canvas. To me, I am “painting” a scene with the inclusion of many different elements, buildings, vehicles, people, scenery and lighting.










ADDITIONAL PHOTOS & VIDEOS
Several years ago, I visited an exhibit in New York City on 44th Street just off Broadway called Gulliver’s Gate. I brought two of my grandchildren with me to experience this exhibit, because it was truly an experience. Gulliver’s Gate consisted of a huge display of various scenes and locations from around the world, with model trains and structures, built in HO Scale. One of the additional features of the exhibit, for an additional charge, was to do a 3D printing individually of each person in my group in HO Scale and incorporate the completed figures in the exhibit and on my home layout. I thought that was kind of cool. However, before I could get the rest of the family 3D printed, the exhibit closed down.
But along comes an outfit, CatzPaw Innovations, LLC (www.catzpaw.com) based in Georgia. You provide them with a photo and height/weight measurements of the individual(s) and CatzPaw converts these to a painted HO Scale figure(s). The CatzPaw team, Sherri and Yolanda, work with you until you are satisfied with the completed product. So, because of CatzPaw, I now have all fourteen members of my family, grandkids, parents, and grandparents, represented on my layout. I know that when they visit our house, they love to look at the scene. Hopefully some or all of the family will develop a greater interest in model railroading down the road. Just a few photos below as the family watches from a dock on my layout.





Tom Walker nails it again with his YouTube video describing his weathering of train cars. Certainly, worth a watch!
Tom Walker shares his 2025 Amherst Train Show experience in the following video:
Tom Walker’s review of GE 44 Ton Diesel engines from Rapido and Bachmann
All of Tom’s videos can be found at his YouTube website at www.youtube.com/@tomychoochoo.
The time on Gary Patrik’s layout is September 1944 0n the Pennsylvania, Fort Wayne Division. It’s wartime and there is lots of rail car activity and special car movements (including a 16″ diameter battleship gun). Also, Pennsylvania’s first Q2 freight engine has entered service just in time to meet the increased demand. The following video shows Pennsylvania Railroad’s Q1 #6130e/b stock/reefer special out of Chicago Union Stock Yards.
Checkout this other video from Gary Patrik. It’s another video of the Q1 which has a surprise – w/b #29, the Broadway Limited with one-of-a-kind streamlined K4s #3768 on the point.
The following is a YouTube video of Bill Arm’s Model Railroad Layout
Tom Walker, Henry Kramer and John Noll discuss model railroading subjects in the following videos that should be of interest to all involved in model railroading and those who are wannabe model railroaders. Henry, Tom, and John are all members of our Hudson Valley Division.
Henry Kramer
The following YouTube video highlights just a few of the modeling projects and layouts of our members.
Here are some awesome photos from Dennis Colucci’s N scale layout. Dennis’s layout is based roughly on the New Haven’s Maybrook Line, with a fictional railroad, the Balfour and Colucci Creek Southern. Dennis’s layout is a 1×6 switching layout. He took all the pictures in natural light.






________________________________________________________________________________________
Building a Resin Butter Dish Milk Car
By: Henry Kramer

Several years ago I moved to the Hudson Valley in New York State. Soon after, a friend of mine invited me to join the New York, Ontario and Western Railway Historical Society. Since I had never heard about this railroad, I went to one of their meetings to check it out. It turns out that the O&W had a long history serving the up-state New York region.
Briefly, the New York, Ontario and Western Railway started out as the New York and Oswego Midland Railroad, running from Oswego on Lake Ontario southeast to the New Jersey border at Unionville. It ran into financial problems and in 1880 was reorganized as the New York, Ontario & Western Railway. After the reorganization the O&W expanded its operations from the Hudson River westward to Lake Ontario. During its long life the O&W was never financially stable. It operated in rural mountainous areas making construction costs high and industry density low. Throughout its life the O&W depended upon three main income streams; coal, passengers, and milk. As these revenue streams dried up the railway was unable to replace them with profitable alternatives and was forced into bankruptcy. On March 29, 1957 it ceased operation and liquidated its assets. (For a complete history of the railway visit the Historical Society website at www.owrhs.org.)
There was an article in the July 2020 edition of the NMRA Magazine titled Borden’s Butter Dish Milk Tank Cars that I found very interesting. The article mentioned that these unique cars ran on many northeast railroads including the O&W. Additionally it mentioned that resin kits from Funaro & Camerlengo were still available. In the past I have enjoyed building several F&C resin kits so when I discovered that one was available on eBay I purchased it.
The kit I purchased must have been a newer version from the one mentioned in the NMRA article. The tank in my kit was fully formed and the detail parts were good quality. I did replace the trucks that were included in the kit with Bettendorf 33” trucks from Kadee. I also replaced the cast brackets with .012” Phosphor-Bronze eye bolts from Barker’s Trains. Finally, in order to get the correct coupler height I used underset shank couplers from Kadee. All of the F&C kits I have built had required using either underset shank couplers and/or adding several washers to the trucks in order to get the correct coupler height. The instructions were not particularly detailed but complete enough to build the kit. The only problem I had was with the underside brake detail. Not being familiar with rail car brakes the instruction statement “… add the brake details with as much piping as you choose to add” was not particularly helpful. Around the mid 1930’s the Borden company started building cars employing a cover, complete with doors and fittings over tanks already fastened to the floor. The cars had the appearance of a butter dish or inverted bathtub on a flatcar. Only a limited number (about 35) of these cars were ever produced. An additional unique feature of these cars was a vertical aluminum fin down the car’s center. These fins were later removed, except on the ends, as Borden’s contribution to a scrap metal effort at the beginning of WW II. The cars carried BFIX reporting marks and were used in Chicago and New York area operations of the Borden’s farm Products Division.
During the car’s life it appeared in three different paint schemes. The red cars started to make their appearance in the latter part of the 1940s. By 1960, only 22 of the originals remained, finishing out their service lives in Borden’s chemical and glue divisions.
Since I am not a stickler for historic accuracy I elected to purchase and build a red Borden car for the simple reason that it would stand out. I also added the top fin for the same reason even though the red cars never had one. Overall, I found building this car to be very enjoyable and am very pleased about how it turned out.
References:
Funaro & Camerlengo kit instructions
New York Ontario and Western Railway Historical Society’s website at www.owrhs.org
Borden’s Butter Dish Milk Tank Cars by George Dutka. July 2020 edition of the NMRA Magazine
Milk Run! The Story of Milk Transpiration by Rail by James A. Kindraka. January/February 1990 edition of Dispatch
