After sixteen years, I finally decided to trash my point-to-point shelf layout that occupies (should be occupied) three walls of a 12′ X 12′ room. This was no easy decision, but I decided to move forward with a new layout for a number of reasons. All of this was thought about after attending multiple sessions and engaging in numerous conversations at the recent NER Convention in Uniondale NY. Not in any particular order.
- Easier to maintain.
- Continuous running vs. point-to-point.
- Downsizing to a smaller, more compact layout.
- I’m not getting younger- the new layout should be easier to operate and take apart down the road.
- 18″ or greater radius curves for improved operation. No curves less than an 18″ radius
- And did I forget to mention….no more tunnels.




While I’m dismantling the old layout, I’m still trying to save structures, accessories, wiring, scenery and track. This makes for slow going and requires a lot of TLC in the process. Not to say anything about the mess and dust! At this point, I have most of the old layout down and I think that I managed to save most of my harbor area. I’m not sure yet what the new configuration will be…I’ll just have to wait and see. A few shots of the harbor area on the new benchwork.




Day 41 marks the demise of my original Awosting Mountain and Middletown Railroad, the one that existed for sixteen years. At this point, on December 28, 2023, except for the harbor area, the layout has been totally dismantled and removed from the room. Some of the structures and scenery have been saved. Now starts the construction of the benchwork for my new layout. Hopefully I won’t be making the same mistakes that I made previously.
Now, one month later, about one-third of the benchwork has been installed for my planned layout. I think that in model railroading terms, this layout would be considered a small one. The area of my planned layout is still a mess! I need to find locations in the room for my modeling paraphernalia but still provides me with easy access to my layout so that I can work on it when the time comes. A note about the benchwork. My benchwork modules are from Sievers Benchwork (www.sieversbenchwork.com). The instructions, suggestions and recommendations provided by Sievers resulted in an installation, so far, that has been easy to assemble. I chose to use a wood stain, Varathane classic black, for no other reason than appearance. Eventually I will add black curtains around the benchwork to hide the wiring below the layout, so I wanted color compatibility. Just a few photos to show the status of the benchwork on January 21, 2024.




The next steps will be to complete the installation of the benchwork. When the framework is completely installed, I will be able to see how far off my paper design measurements are from the real thing. Should be interesting!
Day 117 March 13, 2024 A few more of the Sievers benchwork sections have been added. I estimate my benchwork installation is about two thirds complete. It’s getting tough to move around the room what with the new benchwork being added and the pieces from my previous layout still in the room. Two photos of the installation progress.


So….it turns out that my initial plan dimensions are turning out different than the actual dimensions as the benchwork is installed, not by much, just several inches. However, these few inches are going to matter in the room where my layout is located. I still need to be able to move freely around the perimeter of the layout. This means that I have to adjust the dimensions of my original track plan. In order to “replan” the original track layout, I purchased a bunch of 30″ X 20″ X 1/8″ brown corrugated paper boards from Michael’s Craft Supply Store. These will be laid out over the frame; the track and any track plan modifications will be drawn on the cardboard sheets and, voila, I should be able to transfer this to the foam sheets that are used for the layout base. If you think that there is a better way, please let me know via the CONTACT US page.
March 31, 2024 I laid the cardboard sheets, one at a time, on top of the partially installed benchwork. Then in accordance with the track plan that I am following, HO Scale code 83 track was put down on top of the paper boards as per the following photos. The track is code 83 from Atlas Model Railroad Co. (atlassrr.com). So far, this is the easy part. I still need to figure out how to connect the three-track harbor area, which is an addition to my original track plan, to the actual layout. Working on that as this is written.



April 22, 2024 After tracing the outline of the track plan on the cardboard sheets that I previously laid out, I stood back and took note. At least on the benchwork that has been installed, the track plan fit. However, one concern that stood out to me is that the track at several points is close to the edge. If I don’t install “something” at these points, I run the risk of engines and rolling stock running off the table and landing on the floor!!! Anyway, I’ll try to resolve that issue at a later date.
Now I started replacing the cardboard sheets with 1/2″ foam sheets from Woodland Scenics (https://woodlandscenics.com) and transferred my track plan from the cardboard onto these sheets. In addition, I needed to return to the challenge of connecting the harbor area that I salvaged from my previous layout with the new track plan. Because my harbor scene is about 101.6 mm (4″) above the base, all the additional track on the layout has to be at least the same height or more above the base. It just would not make sense to have track located below the water level of the harbor! In order to rectify this issue, I’m installing 4″ risers from Woodland Scenics with their Foam Tack product. Right now, judging from the photos below, I’m kind of in the middle of connecting the three tracks from the harbor area to a track on my planned layout. At this point, no roadbed, ballast or track is installed. Simply the 1/2″ foam sheets, portions of foam inclines to adjust heights and 4″ risers. I think that this is working out… we’ll see. Until the next update.






May 2, 2024 A famous Scottish poet once wrote, “the best laid plans of mice and men oft gang awry.” After spending a significant amount of time painstakingly detailing a layout plan on graph paper, drawn to scale using an architect’s scale, measuring multiple times, accounting on the plan for the location of the closet and door in the room, and the actual dimensions of my “dream” layout, and drawing the track positions on cardboard sheets, I recently found a flaw with my planning. While I took into account the open and closed position of the door leading into the train room on my drawings, I failed to consider the space the door needs to swing from an open to a closed position and vice versa. So, at this point I have a few choices; remove the door, never close the door to the room, keep the door closed and enter the room through a window, or figure out how to modify my layout plan, yes, the one that I spent so much time creating.
May 13, 2024 I used Atlas Model Railroad Company Code 83 36″ flex track and a few switches in order to link the three tracks from my previous layout’s harbor area to the track of my new layout. Of course, down the road, I’ll still have to complete roadbed installation, then test run an engine and some cars over the track, correct any problems and then complete ballast installation.


At the same time, some progress is also being made on the rest of the layout.



June 24, 2024 At this point in time, the last sections of the Sievers benchwork were installed. The section that I was concerned about, a 45o triangle with 20-inch sides, was connected to the layout and is pretty close to the room door swinging open and closed. In fact, once again my measurements were off, and I failed to take into account the thickness of the triangle assembly. In fact, I had to shave about 1/4″ (about 7mm) off one side of the triangle in order to solve the door open/close problem. See following photo.

Now the good news, as I mentioned the Sievers frame is complete, the Woodland Scenics 1/2″ foam sheets have all been laid out on the benchwork, and depending upon layout location, I am at various stages of 4″ riser installation, covering with plaster sheets, carefully attaching the roadbed to the risers, laying out the track, first with 2″ foam nails for fit and then replacing these with 1/2″ (about 13mm) track nails for permanent attachment, then ballasting the track, and finally using liquid track cleaner on the installed/ballasted track. And not to make the same mistake as I did on my previous layout, at each step, I tested the electrical connectivity with a voltmeter and track connect integrity by running an engine over the track, something that I did not do on my previous layout, and I paid dearly for that. I don’t know if I mentioned this but my layout is DC and I have about fifteen separate block sections, each one managed by a setting on Atlas Selectors. Again, I think that the keys to this entire project are patience, repeated testing of the track for glitches, cleaning the track and validating the electrical connections.






July 12, 2024

July 16, 2024 The journey that began back in November 2023 has taken eight months to reach this point. Now I know how an artist feels when a blank, untouched canvas is in front of him/her (a bit dramatic but that is how I feel). That’s exactly how I feel looking at the layout in front of me. The Sievers Benchwork is all complete, the Woodland Scenics 1/2″ foam sheets, 4″ risers and roadbed are installed, the Atlas Model Railroad track, turnouts and crossover are in place and all track has been ballasted. I’m using DC power, so I have fourteen individual blocks with power supplied to the mainline and sidings through two MRC TECH 7’s. One controls power to the mainline (five separate blocks) and the other controls power to the sidings (nine blocks). Each block is managed through an Atlas Selector. Throughout the install steps, I constantly re-cleaned track and checked the track for no kinks. I ran several engines over the different sections to verify the integrity of my trackwork and then re-cleaned sections of track again. I do believe that one secret to having a smooth-running operation is clean, dirt-free track and testing. In the near future I do plan to submit an application for the NMRA’s Golden Spike Award. However, for the time being, looking at my blank canvas, I must decide locations…. locations of industries, buildings, stations, towns, etc.
October 1, 2024 So it’s been more than two months since my last layout update. I’ve been working on the NMRA’s Golden Spike Award requirements. The first item on the NMRA checklist addresses Rolling Stock (Motive Power & Cars). Many thanks to Dennis Colucci, a member of our Division, who conducted a few sessions on weathering freight car techniques. I used Dennis’s methodology on several of my freight cars. On a few other cars, I applied a gentler weathering technique.








October 14, 2024 The second item on the NMRA checklist is Model Railroad Setting (Structures & Scenery). So, just a few of the structures, some from craftsman kits and some are detailed commercial kits, that are complete and installed on my layout.











November 17, 2024 Wow!!! It’s been a whole year since I started a rebuild of my layout. It’s moving along. Anyhow, so on my quest for NMRA’s Golden Spike Award, the third requirement is for three different types of trackage, wiring so that two trains can be operated simultaneously, and additional electrical features, such as lighting. The following pictures address these requirements.





The next picture shows the central point of wiring for my DC only layout. A description of the wiring scheme has already been provided.

Next comes the additional electrical features. On my layout, I chose lighting and actionable objects.


My layout, at this point in time, has two types of houses, an outhouse with an electrically operated door that swings open and a lighthouse.






So, these photos represent only a small portion of the material that was submitted in my pursuit of the Golden Spike Award. I haven’t received any feedback related to my submission yet but as soon as I hear I’ll update this post. In the meantime, as I progress on my new layout, I will share the work with everybody.
January 4, 2025 First Happy New Year to all! In the past two months, I have been actively engaged in adding structures, enhancing track ballasting in spots where needed, adding lots of lighting (I think that the lights add a touch of realism to the layout, thanks to Woodland Scenics for their easy to implement lighting system), scenicking and running trains over track just to be sure that everything remains copacetic. The building structures that are on my layout now are a combination of craftsman kits from Downtown Deco, Campbell, Bar Mills, Muir Models Wizards of Wood, kits requiring assembly and detailing mostly from Desin Preservation Models and a couple of Woodland Scenics Landmark Built-&-Ready structures, just because I get lazy sometimes. First a few pictures taken at night.



The next series of pictures are daytime shots of the above buildings.









Next planned project is implementation of a larger town with a trolley running down Main Street and maybe a park also. This will probably take three to four weeks to complete. Keep watching for posts.
March 30, 2025 I’m glad to report that I received the NMRA’s Golden Spike Award at our Division’s January 2025 meeting. Just to reiterate, your layout does not have to be complete so long as you satisfy the requirements associated with the Award. I framed my award and hung it up in my train room.

March 30, 2025 My project took a little longer than expected. But I did complete my vision of the town of Middletown (Orange County, New York), Midway Park (again my version of a real park that existed in the town of Wallkill in the early 1920s) and the Wallkill trolley line running down Main Street in Middletown (Wallkill Transit actually ran between Goshen and Middletown NY with a stop at the real Midway Park in the early 20th century). My point here is that model railroading does not have to be reproductions of real or once real railroads, what we call prototype modelling. There’s plenty of room in the hobby for people with creative imaginations and visions of what they would want their model railroad to look like and that is how their layout evolves.



At this point in time, I would have to say that my layout is maybe a little more than half complete. The next project that I’m envisioning is a residential area with an assortment of craftsman kit homes.
April 30, 2025 Before I become engaged on the project to install a residential area on my layout, I decided to tackle three craftsman kits, two of which are really ancient, for the purpose of installing a coal and oil scenario. For the past month, I’ve tackled the Bar Mills Queen City Coal facility, Alexander Scale Models Oil Tank and Loading Rack, and Muir Models Wizards of Wood NY Ontario & Western Wurtsboro New York coaling facility. Remnants of the Wurtsboro structure are still in place. I renamed Bar Mills’ Queen City Coal, Middletown Coal Co. to bring it closer to home. Assembly was pretty straightforward for all three and directions were easy to follow. I installed a fourth oil related structure, one I had salvaged from my previous layout but of an unknown source, near the other three.




Anybody who may have an idea about who is behind the fourth kit, please let me know, Bob Yustein, via the CONTACT US communication on our website.
January 27, 2026 So, there is a small corner of my layout that looked kind of bare. Didn’t know whether to just throw some trees and scenery on the corner or add something a little more detailed. Went looking through my myriad of unassembled buildings and came up with a Muir Models, Wizards in Wood, Scrap Metal Processing Facility.








To complete the scene, I added some scenic detail, two gondolas on the siding and a lot of scrap metal from Coastman’s Scenic Products, located in Oxford, Oregon. And this is how I took care of the bare corner on my layout.
January 29, 2026 Back to installing the three upscale houses on this side of the tracks. The first is Campbells Grandma’s House, which incidentally I actually built a little incorrectly. Two walls of the house are not in the correct positions. However, this error is not obvious, I don’t think!






The next is Alexander Scale Models Haunted House which I chose to build as non-haunted since I already had a couple of uninhabited, abandoned houses on my layout.


And lastly, Monroe Models Ellie’s House.

Now, of course, the well-to-do residents on this side of the tracks need a station for their commuting and travel. So, here is the Conowingo Models Eliminator Depot.

Next, we’ll take a look at the other side of the tracks.
February 1, 2026 This is what I call my Bar Mills corner. Three kits, Coopers Way (which is actually six or seven different buildings, Wicked Wandas and Puffer Welding. These are the assembled buildings on the other side of the tracks. Model railroading is lots of different things to lots of people. For me, when I look at a bare spot on my layout, I am an artist in front of a blank canvas. To me, I am “painting” a scene with the inclusion of many different elements, buildings, vehicles, people, scenery and lighting.










